How to specify compliance evidence for an industrial monitoring project

3 hours ago
2 min read

On a multi-site project, give each document an owner and an equipment reference. The pressure transmitter, calibration laboratory, dashboard and completed installation can each have different evidence requirements. ProSense Solutions can help identify what to request at quotation and handover.


Supplier qualification

Where held by the manufacturer, request ISO 9001 for quality management, ISO 14001 for environmental management and ISO 45001 for occupational health and safety. Record the certificate holder, sites covered, scope and validity against the proposed supplier. ProSense Pty Ltd uses ISO 9001 quality-management principles in purchasing and supplier review.


Hazardous areas and safety functions

For each instrument tag, record the exact model and variant alongside the site classification. Request the applicable ATEX documentation or IECEx certificate and review its schedule and conditions with the responsible engineer. For a function with a SIL target, obtain the device safety manual and assessment. The project engineer must verify the complete safety function. If the project involves a mobile elevating work platform, identify the applicable EN 280 part and request evidence for the platform configuration.


Calibration and acceptance

Agree calibration points, uncertainty and serial-number tracking before equipment is ordered. ProSense can arrange calibration through Australian NATA-accredited laboratories within their accredited scopes. Where a client specifies NIST traceability, agree which reference and calibration records the client requires for the measurement result.


Records for food and pharmaceutical sites

For HACCP monitoring, map each critical control point to its sensor, critical limit, review process and corrective-action record. For a system subject to FDA 21 CFR Part 11, identify the regulated records and signatures, software version, access controls, audit trails and validation responsibilities. Ask the software supplier for evidence relevant to the proposed configuration.


Example handover requirement

For a cold-chain rollout, list each probe and its calibration certificate, the recorder or gateway it reports to, and the person responsible for reviewing an excursion. If the client needs electronic sign-off, include an acceptance test using the intended roles and software version. Send the equipment schedule and tender clauses to sales@prosense.com.au for a project-specific documentation review.

 
 