LoRaWAN Sensors and Gateways for Industrial Monitoring
Updated: 13 hours ago
Follow one measurement from the sensor to the operator
Start with an actual point, such as a tank level. Write down the physical quantity and units, how often the sensor takes a reading, when it transmits and how long the operator can wait for an alert.
During the site trial, compare a known reading with the decoded value in the application. Then miss a scheduled report deliberately and check that the operator can identify stale data.

Separate the radio link from the internet connection
The sensor transmits to a LoRaWAN gateway. The gateway forwards its messages to a network server, which passes the decoded readings to the application. Decide whether the gateway will use site Ethernet or cellular backhaul.
Match the devices to the site
Check the radio frequency plan, intended sensor locations and obstructions. List the reporting intervals and expected message sizes, then test reception with representative devices. Obtain a battery estimate for the proposed settings.
Define a reporting interval for each measurement
Pits and pump stations
Agree how quickly the operator needs to see a rising level. Compare the measured level with a site reference and test reception with the pit cover in its normal position.
Irrigation blocks
Record the probe depth, irrigation zone and last rain or watering event. Check that the application reports the expected moisture units and identifies a missing reading.
Plant rooms and warehouses
Cabinets, steel partitions and racking can affect the radio path. Check reception with the sensor mounted where it will operate, then compare the displayed value with a local reference.
Environmental stations
Request the measurement time and the time the dashboard received it. These can differ after an interruption. Include both in the acceptance record if the history is used to review events.

Put the alarm timing on the quote
Specify the sensor sampling interval, transmission interval, dashboard refresh and notification route. For a battery-powered device these can be different settings. Test the elapsed time with the proposed configuration.
Check the gateway and application before rollout
List the gateway model, network server, payload decoder and destination application. Assign a person responsible for the SIM or Ethernet link and for checking missed reports.
Plan the site test